Dimensi : 2420 mm x 1600 mm x 1420 mm. Frame : UNP 120
Penggerak : Motor listrik , daya 5,5 KW.
Panel Inverter : 30 KW
Transmisi : Gear box Transtecno ITH 132/3.
Tyre : dia 600 mm. Kecepatan : 5 knot/hr. Dia kabel : 0 - 60 mm.
| No | Lokasi | Tanggal | Project |
|---|
| # | Tanggal Certificat | Tanggal Expired | Lembaga |
|---|
| # | Tanggal Preventive | Tindakan Preventive | Petugas |
|---|---|---|---|
| 1 | 06 November 2023 | SERVIS RINGAN. CHECK : KELISTRIKAN PANEL POWER SUPPLY, OLI, LEAKAGE, FILTER, GREASE BEARING, TEKANAN BAN, KOPLING, SPROKET, HOSE DAN PISTON HIDROLIK, ROLLER CHAIN. RUNNING TEST | JUNIARDI, SUGENG |
| 2 | 19 January 2024 | SERVIS RINGAN. CHECK : KELISTRIKAN PANEL POWER SUPPLY, OLI, LEAKAGE, FILTER, GREASE BEARING, TEKANAN BAN, KOPLING, SPROKET, HOSE DAN PISTON HIDROLIK, ROLLER CHAIN. TAMBAH OLI HIDROLISRUNNING TEST . | SAPUTRO, SUGENG |
| 3 | 28 June 2024 | SERVIS RINGAN. CHECK : KELISTRIKAN PANEL POWER SUPPLY, OLI, LEAKAGE, FILTER, GREASE BEARING, TEKANAN BAN, KOPLING, SPROKET, HOSE DAN PISTON HIDROLIK, ROLLER CHAIN. RUNNING TEST | JUNIARDI, YOGA |
| 4 | 02 July 2025 | SERVIS RINGAN. CHECK : KELISTRIKAN PANEL POWER SUPPLY, OLI, LEAKAGE, FILTER, GREASE BEARING, TEKANAN BAN, KOPLING, SPROKET, HOSE DAN PISTON HIDROLIK, ROLLER CHAIN. RUNNING TEST | SUGENG, AGUS DONI |
| 5 | 07 October 2025 | SERVIS RINGAN. CHECK : KELISTRIKAN PANEL POWER SUPPLY, OLI, LEAKAGE, FILTER, GREASE BEARING, TEKANAN BAN, KOPLING, SPROKET, HOSE DAN PISTON HIDROLIK, ROLLER CHAIN. RUNNING TEST | JUN, AAN |
| 6 | 25 November 2025 | SERVIS RINGAN. CHECK : KELISTRIKAN PANEL POWER SUPPLY, OLI, LEAKAGE, FILTER, GREASE BEARING, TEKANAN BAN, KOPLING, SPROKET, HOSE DAN PISTON HIDROLIK, ROLLER CHAIN. RUNNING TEST, KONDISI : BAIK | SUGENG |
| 7 | 18 November 2025 | SERVIS RINGAN. CHECK : KELISTRIKAN PANEL POWER SUPPLY, OLI, LEAKAGE, FILTER, GREASE BEARING, TEKANAN BAN, KOPLING, SPROKET, HOSE DAN PISTON HIDROLIK, ROLLER CHAIN. RUNNING TEST, KONDISI : BAIK | SUGENG |